Go Back

Dry Core Drilling for Ducting Installation

York, England
Paradigm Developments

The Project Brief

We were contacted by Paradigm Developments to carry out diamond core drilling works at a site in York. The client required several holes to be formed for ducting, but had been unable to find a local company that could attend at such short notice.

Due to the building being a new build, and close to completion, it was important that the work was carried out cleanly and without the use of water. The requirement was to drill two 275mm diameter holes on one side of the building and two 225mm diameter holes on the other, all using dry drilling methods.

The Process

Our team attended the site with one day’s notice, arriving fully equipped to carry out the work using our specialist dry drilling equipment. Before starting, we marked out all hole positions in line with the client’s requirements to ensure correct placement for the ducting installation.

Dry drilling requires a controlled and steady approach to maintain accuracy while managing dust effectively. Using the appropriate equipment, we worked methodically through each opening, maintaining consistency across both the 275mm and 225mm holes.

Despite the short timeframe, the drilling was completed efficiently and in a controlled manner, allowing the work to be carried out without disruption to the surrounding finished areas.

Why Dry Drilling is Well Suited to New Builds

Dry drilling is particularly effective in new build environments where internal areas are already finished or nearing completion. By removing the need for water, there is no risk of damage to floors, walls, or installed finishes.

This approach helps maintain a clean working area and avoids the additional time that can be required for protection and clean up when using wet drilling methods. It also allows work to be carried out in a more controlled way, which is important when other trades are working nearby or when areas are ready for handover.

A Clean Result for Paradigm Developments

All four core holes were completed to the required sizes and positions, providing accurate openings ready for the ducting installation.

Paradigm Developments were extremely happy with the standard of the work and our ability to attend and complete the job with only a day’s notice, helping them keep the project moving without delay.

Supporting Contractors with Reliable Core Drilling

We regularly support contractors who require diamond core drilling at short notice, whether for ducting, ventilation, or general service installations. Our approach is always focused on delivering accurate work in a clean and controlled manner, using the right method for the environment.

If your project requires specialist core drilling, contact our team, we are always happy to discuss the most suitable approach.